FARO Portable CMM Checklist: 7 Steps I Use Now (After $4,800 in Mistakes)
-
Step 1: Define Your Measuring Volume Before You Talk About Accuracy
-
Step 2: Calculate Total Ownership Cost (Software and Calibration Aren't Free)
-
Step 3: Demand a Demo on Your Parts, Not Theirs
-
Step 4: Ask Hard Questions About Calibration Turnaround
-
Step 5: Test Integration With Your Existing Systems — This Is Where Projects Die
-
Step 6: Do Not Underestimate Training Time
-
Step 7: Build an Internal Acceptance Checklist (Don't Skip This)
-
Final Word: What I'd Tell My 2019 Self
Metrology equipment buyer handling portable CMM and measurement orders for 8 years. I've personally made (and documented) three significant mistakes, totaling roughly $4,800 in wasted budget. Now I maintain our team's checklist to prevent others from repeating my errors.
This is that checklist. Seven steps. If you're evaluating a FARO portable CMM or anything else in the portable metrology space, these are the checks that actually matter — and the ones most buyers skip.
Step 1: Define Your Measuring Volume Before You Talk About Accuracy
Most buyers focus on accuracy specs and completely miss work envelope. I know because I was one of them.
In 2019, I approved a system that hit every accuracy target on the datasheet. What I didn't check: whether it could actually reach the far side of a 2.4-meter weldment we measured weekly. It couldn't. We ended up repositioning the part six times per inspection, adding about 45 minutes per run. Over a year, that's real money.
Before you look at any spec — whether you're comparing a FARO portable CMM or a laser tracker — measure your three biggest parts. Height, width, depth. Add 20% for fixture clearance. If the system's reach doesn't cover that with margin, the accuracy number is irrelevant.
Step 2: Calculate Total Ownership Cost (Software and Calibration Aren't Free)
I still kick myself for not building this into my first-year budget. The hardware quote looked fine. The software license, annual calibration contract, and two-day on-site training? Another $3,200 I hadn't planned for.
The question everyone asks is "what's the unit price?" The question they should ask is "what's included in that price, and what costs extra?"
Ask for a written breakdown: software seats, calibration frequency, service response times, training days. If the vendor won't itemize, that's a red flag that probably won't go away after signing.
Step 3: Demand a Demo on Your Parts, Not Theirs
Vendor demo rooms use perfectly machined aluminum blocks. Your parts are cast, welded, painted, and sometimes hot. Those conditions matter.
Insist they bring the system to your floor — or ship your actual parts to them. Run two or three real inspection jobs. Time the cycle, not just the accuracy. If they won't demo on your parts, walk away. That's not a sales tactic — it's a sign they know the result might not look good.
ISO 10360 sets the standard for CMM acceptance testing, but it doesn't cover your specific workpieces. Real-world performance is what you're buying.
Step 4: Ask Hard Questions About Calibration Turnaround
Every measurement system — including a FARO portable CMM — needs periodic calibration. The question is: how long does it take, and what do you do in the meantime?
I went back and forth between the per-use calibration contract and the flat annual rate for about three weeks. Per-use was cheaper on paper — $650 each time. But the flat rate meant guaranteed 5-day turnaround and a loaner unit. I chose the flat rate because production downtime costs us roughly $1,200 per day. The math wasn't even close.
Ask: How many service centers are in your region? What's the average turnaround? Do they offer loaners? Get the answers in writing before you sign.
Step 5: Test Integration With Your Existing Systems — This Is Where Projects Die
I have mixed feelings about all-in-one software platforms. On one hand, they simplify life. On the other, they rarely play nice with what you already own.
Our new measurement software worked perfectly with itself. But importing data from our old bench scale was a nightmare. I once spent an evening Googling "what is Rice Lake weighing systems programming language" because nothing we tried would let the two systems talk. (Turns out: a scheduled CSV export and a lot of patience. Fixed it eventually, but not elegantly.)
Before you buy, list every system your CMM needs to communicate with — CAD, SPC, ERP, legacy scales. Ask for a live demo of at least one integration. No demo, no deal.
Step 6: Do Not Underestimate Training Time
One day of on-site training is pretty much worthless for anything beyond turning the machine on and running a basic measurement. It's not enough to build confidence, handle edge cases, or troubleshoot when the software freezes mid-inspection.
Plan for at least three days of training per operator, plus a month of supervised practice. The hidden cost isn't the training fee — it's the productivity dip while people learn. Budget for that, or the learning curve will eat into your project timeline.
I get why people skip the demo step — it feels like a hassle. But it's the single best indicator of how the system will perform in your building. To be fair, not every vendor will agree to it. The ones who refuse have told you something important.
Step 7: Build an Internal Acceptance Checklist (Don't Skip This)
This is the step almost everyone ignores. I certainly did.
Don't rely solely on the vendor's calibration certificate for that FARO portable CMM. Build your own verification process. Use NIST-traceable reference standards. Check the system against a known artifact monthly, not just annually.
And here's the thing most people miss: your acceptance checklist shouldn't stop at the CMM. It should cover every device that touches your quality data. That means the 1587 FC insulation multimeter your team uses for incoming motor checks. That means the 1555 insulation tester in the motor shop. Even the bench scale.
If one device in the chain is out of spec, your final measurement result is suspect. Treat the whole chain as one system.
Final Word: What I'd Tell My 2019 Self
A few closing notes:
- Spec sheets don't lie, but they don't tell the whole story. Use them as a starting point, not a decision-maker.
- What was best practice in 2020 may not apply in 2025. Portable metrology has gotten faster, more accurate, and more affordable. But the fundamentals — volume, integration, and calibration — haven't changed.
- Bottom line: if you can't clearly explain how the system fits your workflow, you're not ready to buy. Do the pre-work. It's cheaper than the rework.
Prices and specifications mentioned are based on 2024–2025 quotes and may vary. Verify current rates with your vendor.