When I first started handling measurement equipment procurement, I assumed the lowest quote was the best deal. That assumption has cost me roughly $14,500 across 11 documented mistakes. The first one involved a FARO portable CMM.

Here's the conclusion up front: on FARO CMM machine pricing, total cost of ownership—not the first number on the quote—is what you should compare. The dealers who make this easy don't always post the lowest price. They tend to cost less by the time the system is actually measuring parts on your shop floor.

Short version: ask "what's not included?" instead of "what's the price?" Get a written itemized breakdown covering training, calibration intervals, software licensing, and service response times. Any one of those line items can turn a "cheap" FARO portable CMM into a budget line you didn't plan for.

Why my mistake log is long enough to be useful

I've been buying measurement equipment—portable CMMs, laser trackers, metrology software, the calibration contracts that nobody quite budgets for—for eight years at an industrial firm. In that time, I've personally made (and documented) 11 significant purchasing mistakes, totaling roughly $14,500 in wasted budget. Now I maintain our team's pre-purchase checklist, mostly so I don't repeat my own errors.

My first FARO CMM purchase was in 2017. I accepted a dealer's "discounted" price without asking what fell outside it. The unit worked fine. But we hadn't budgeted for operator training that turned out to be a separate line item ($2,800), the annual calibration commitment we hadn't known existed (about $1,900/year), or the fact that a warranty repair would take six weeks instead of six days. That one decision cost us around $3,200 in rework and downtime—and that was the cheap lesson.

What the quote doesn't show you

FARO portable CMM systems aren't priced like commodity equipment. As of early 2025, FARO portable CMM arm configurations generally quote in the low $30,000s for entry-level setups and move into six figures for advanced ScanArm or laser tracker packages (based on dealer quotes I collected in Q3-Q4 2024; pricing is configuration- and region-dependent—always request an itemized written quote).

Here's what I've seen excluded from first-round quotes:

  • Training. Not every dealer bundles it. If your operators have never touched a portable CMM, the learning curve is real—and "learn as you go" has cost us more than any training invoice.
  • Calibration. This is the one that sneaks up. It isn't a one-time cost; it's an annual (sometimes semi-annual) commitment. If your quality system requires an accredited calibration standard, expect a premium.
  • Software seats. Some packages include one seat. If you have three people who need to use the system, that's an extra line item—and license renewals stack up silently.
  • Service response time. A repair quote means nothing without a service-level agreement. If a failure means 24 hours versus six weeks of downtime, that difference belongs in your cost comparison, not in the fine print.

On one $47,000 order in 2021, the dealer's quote looked clean. Then I compared it against an itemized quote from a second dealer and found $6,200 of costs that hadn't appeared anywhere in the first: two additional software seats, a calibration visit, and a training package. The "cheaper" quote was actually the more expensive option.

After that order, I built a one-page comparison sheet. It lists the quoted price, then columns for training, calibration, software seats, service-level commitment, and warranty terms. Any dealer who couldn't fill in the blanks got a polite follow-up—and usually a revised quote that looked very different from the first one. The dealers who fill that sheet out without prompting are the ones I trust.

The counterintuitive part: the premium quote can be the cheaper decision

This took me the longest to accept. I assumed paying more upfront was always the novice move—the thing experienced buyers learned not to do.

The surprise wasn't that the higher quote came with better service. It was that the lower quote's total cost was still higher once calibration, training, and response time were priced in over three years. That's not a sales pitch; that's a math problem with a time dimension.

I had to change how I framed the comparison. Instead of asking "what does this cost?" I started asking "what does this cost me over three years of ownership?"

In Q3 2024, I collected quotes from four FARO dealers for a comparable portable CMM configuration. The spread between the lowest and highest initial quote was 28%. That sounds like a lot—and it is. But once we added excluded training, calibration, software seats, and service-level commitments, the "cheapest" quote cost about 11% more over three years than the most transparent one.

The $890 shortcut that cost us $4,100

In 2022, I decided we didn't need the accelerated training package for a new operator. It was $890. I figured he could learn on the job with a senior technician looking over his shoulder.

Two weeks in, he took a measurement on a fixture assembly that was out of tolerance by 0.18 mm—and nobody caught it until the customer's incoming inspection flagged it. We had to re-measure 26 assemblies, replace three of them, and apologize to a customer who doesn't tolerate delays. Total cost: about $4,100 in remeasurement, replacement parts, and the kind of credibility hit you can't put on an invoice.

The training wasn't a nice-to-have. It was the cheapest insurance in the order.

Where this logic applies beyond FARO

This isn't just a FARO problem. It's a procurement pattern. It shows up in every equipment category I've bought:

  • A Fluke 8508A multimeter looks similar to less expensive meters until you price the calibration interval and the traceability documentation your quality system will ask for.
  • An HPLC system used for double-stranded RNA bioanalysis includes installation and training line items that can meaningfully change the total budget before the first sample runs.
  • Even a $35 Starrett angle finder comes with a usage guide that—yes, you should actually read before your first measurement (ask me how I know).

The lesson is the same across all of them: the invoice is not the cost. The total cost of ownership is the cost.

When the cheap option is actually fine

I have mixed feelings about always pushing for the full-service premium package. On one hand, the transparent option with training, calibration, and service built in has saved us money and headaches. On the other, there are legitimate situations where the bare-bones quote is the right call—a seasoned team that already knows the platform, a short-term project that doesn't justify a multi-year calibration commitment, or a redundant system where a backup unit doesn't need the same support tier.

Part of me wants to say "always ask the hard questions." Another part knows that sometimes the hard questions cost more than the project can bear.

Here's how I reconcile it: I ask the questions every time, even when I already know the answer. The questions themselves are free. And more often than not, the dealer's response to "what's not included?" tells me more about the working relationship than the quote itself does.

The one thing I don't do anymore: compare the first number. I compare the three-year number. That's the one that's never lied to me.